{"id":11195,"date":"2014-07-23T02:23:44","date_gmt":"2014-07-23T00:23:44","guid":{"rendered":"http:\/\/fishconsult.org\/?p=11195"},"modified":"2014-07-23T02:23:44","modified_gmt":"2014-07-23T00:23:44","slug":"water-analysis-prior-to-the-construction-of-merowe-dam-sudan","status":"publish","type":"post","link":"https:\/\/fishconsult.org\/?p=11195","title":{"rendered":"Water analysis prior to the construction of Merowe Dam, Sudan"},"content":{"rendered":"<p><b style=\"font-size: 12px;\">Credit:<\/b><span style=\"font-size: 12px;\"> Mamoun Obeida (Sudan)<\/span><\/p>\n<h1 style=\"text-align: justify;\"><span style=\"font-size: medium;\">Merowe Dam was constructed in North State, Sudan. The photo was taken during the pre-construction of the dam whereas the physical and chemical properties of water were periodically analyzed including (pH, water conductivity, temperature and Dissolved Oxygen. This work was funded by Dams Implementation Unit. This analysis was stopped after the completion of the dam.<\/span><\/h1>\n<p><a href=\"https:\/\/i0.wp.com\/fishconsult.org\/wp-content\/uploads\/2014\/07\/Sudan-Water-analysis-in-Merowe-Dam.jpg\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" data-attachment-id=\"11196\" data-permalink=\"https:\/\/fishconsult.org\/?attachment_id=11196\" data-orig-file=\"https:\/\/i0.wp.com\/fishconsult.org\/wp-content\/uploads\/2014\/07\/Sudan-Water-analysis-in-Merowe-Dam.jpg?fit=623%2C533&amp;ssl=1\" data-orig-size=\"623,533\" data-comments-opened=\"0\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;0&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;}\" data-image-title=\"Sudan &amp;#8211; Water analysis in Merowe Dam\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/i0.wp.com\/fishconsult.org\/wp-content\/uploads\/2014\/07\/Sudan-Water-analysis-in-Merowe-Dam.jpg?fit=623%2C533&amp;ssl=1\" class=\"alignleft size-medium wp-image-11196\" alt=\"Sudan - Water analysis in Merowe Dam\" src=\"https:\/\/i0.wp.com\/fishconsult.org\/wp-content\/uploads\/2014\/07\/Sudan-Water-analysis-in-Merowe-Dam-300x256.jpg?resize=300%2C256\" width=\"300\" height=\"256\" srcset=\"https:\/\/i0.wp.com\/fishconsult.org\/wp-content\/uploads\/2014\/07\/Sudan-Water-analysis-in-Merowe-Dam.jpg?resize=300%2C256&amp;ssl=1 300w, https:\/\/i0.wp.com\/fishconsult.org\/wp-content\/uploads\/2014\/07\/Sudan-Water-analysis-in-Merowe-Dam.jpg?w=623&amp;ssl=1 623w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Credit: Mamoun Obeida (Sudan) Merowe Dam was constructed in North State, Sudan. The photo was taken during the pre-construction of the dam whereas the physical and chemical properties of water were periodically analyzed including (pH, water conductivity, temperature and Dissolved Oxygen. This work was funded by Dams Implementation Unit. This analysis was stopped after the &hellip; <\/p>\n<p><a class=\"more-link btn\" href=\"https:\/\/fishconsult.org\/?p=11195\">Continue reading<\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[359,291,293],"tags":[5173,5175,3719,5174],"class_list":["post-11195","post","type-post","status-publish","format-standard","hentry","category-aquaculture-and-artisanal-fishery-global-information-sharing","category-gallery-2","category-photos","tag-merowe-dam","tag-prior-construction","tag-sudan","tag-water-analysis","item-wrap"],"aioseo_notices":[],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_shortlink":"https:\/\/wp.me\/p1NIq6-2Uz","jetpack_sharing_enabled":true,"jetpack-related-posts":[],"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/fishconsult.org\/index.php?rest_route=\/wp\/v2\/posts\/11195","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/fishconsult.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/fishconsult.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/fishconsult.org\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/fishconsult.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=11195"}],"version-history":[{"count":2,"href":"https:\/\/fishconsult.org\/index.php?rest_route=\/wp\/v2\/posts\/11195\/revisions"}],"predecessor-version":[{"id":11198,"href":"https:\/\/fishconsult.org\/index.php?rest_route=\/wp\/v2\/posts\/11195\/revisions\/11198"}],"wp:attachment":[{"href":"https:\/\/fishconsult.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=11195"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/fishconsult.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=11195"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/fishconsult.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=11195"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}