Credit: Mamoun Obeida (Sudan) Merowe Dam was constructed in North State, Sudan. The photo was taken during the pre-construction of the dam whereas the physical and chemical properties of water were periodically analyzed including (pH, water conductivity, temperature and Dissolved Oxygen. This work was funded by Dams Implementation Unit. This analysis was stopped after the …
Tag: Merowe Dam
Permanent link to this article: https://fishconsult.org/?p=11195